Cardinal Newman College

Value: Phased Works £30,000 - £350,000 projects | Client: Cardinal Newman College | Time: 5 years


About the Project

Numerous fast track programmes have been completed at Cardinal Newman College throughout 2009-2014 in various phases. Works being undertaken during term time and holiday periods.

The works included refurbishment of existing classroom and student areas for power, lighting, data, and fire alarm.

New dining and student facilities were updated with new lighting and power to existing and new services, fire alarm and data including LED feature lighting.

Further works were then carried out to the original Georgian Building. Electrical and lighting installations to a new atrium and students lounge area creating a modern light feeling with energy saving lighting.

New smart metering has been installed to provide the college with easy recording of electricity usage helping them reduce carbon footprint.

Installations to a state of the art Theatre space including a large Theatre, 3D Cinema space, lecture style classrooms and dedicated performing arts space.

The electrical installation brings the existing building up to a modern practical learning area designed for all further education requirements.